1. Before Machine Operations
1.1 You need to follow this manual to make sure the operation safety and the high productivity.
1.2 Self-protection Items
1.2.1 Wear eyeglasses, gloves and necessary uniforms to make sure the safety during material handling and machine operations.
1.2.2 In case of eye contact, please flush your eye with clean water, and sent the worker to hospital if it is necessary.
1.2.3 Non-slipping floor need to be used in the workshop. And workers need to wear rubber sole shoes.

 

2. Safety Issue.
2.1 Only trained workers are allowed to operate or fix this machine
2.2 Air conditioning need to be used, to keep the workshop in fresh air.
2.3 Machine warming time is more than 10 minutes.
2.4 Lights need to be equipped in the workshop and make sure the sight is good.
2.5 Clean working area and the mix head after the production is done.
2.6 ISO and POLY material need to be marked in sight, and keep it separately in a safe place.
2.7 Make sure add correct material into correct tanks, or the machine will be damaged.
2.8 Easy broken parts are included, if the maintaining needed, you can used the original parts.
2.9 Cut the power off before you want to open the control cabinet.

 

3. You need to dismantle the mix head and mixing unit immediately in bellow conditions:
3.1 Power off during production
3.2 Mixing cavity starts foaming process
3.3 Cleaning agents (MC) can not be sprayed out.

 

4. Machine Constructions
4.1 PU machine
POLY system, the working temperature is about 19-25 degree. The set temperature need to be confirmed with the material supplier for better performance.
4.2 Material flow:
Material will be finally into mixing head through filter, metering pump, mix cavity after metered. It will be ready to be injected or recycled into the material tank. Material weight need to be controlled by the controlling cabinet, to make sure the output accuracy, sync output of A and B, the mixing, and cleaning.
4.3 Metering Unit
To provide metering and mixing function for mix head. High quality gear pump are used, equipping with adjustable drive and frequency adapter. Material will be back into the tank if supplying amount is more than the needed amount.

 

5.Prepare for operation
5.1 Make sure the whole process is right. (Motor rotating direction test).
5.2 Connect the air hoses to the air joints. Set the pressure at 7-8Mpa. Set MC tank pressure at 1-1.5Mpa.
5.3 Make sure the MC tank liquid level is in the right range
5.4 Release the pressure before adding liquid into MC tank
5.5 Make sure the material level is at the right range, or need to fill material
5.6 Check the filter net, if foreign affairs shows, clean the net and dry it, put it back
5.7 Check if the output mouth is clean, and the output amount would be effected by it.
5.8 Dismantle the mixing head, and clean the parts
5.9 Make sure the cleaning and blowing is in good process. Press MC button, to make sure the spray process in function. After spray process the air blowing would be in progress, and this will clean the mixing head.The cleaning time can be set through the controlling cabinet. Usually, the preset time is about 3-5 seconds. Blowing time is 3-6 seconds. Blowing pressure is 7-8Mpa.
5.10 Make sure the pressure of material tank, if it is overload, the motor will stops.

 

6. Controlling Cabinet Introduction
6.1 MT: Next injection time setting, after motor starts
6.2 MC: MC cleaning time setting
6.3 AIR: Blowing time setting
6.4 CI: Alert in function if cleaning not in process in set time
6.5 ALM: Alert time setting
6.6 Number 1-12, is for injection time setting

 

7. How to calculate the material amount
7.1 Dismantle the mixing cavity and the mixing head
7.2 Set the metering function to Manual
7.3 Set the metering time at 3 or 5 seconds
7.4 Turn off B motor and meter A amount
7.5 Turn off A motor and meter B amount

7.6 Each material metering
7.6.1 Put a metering cup under the mixing head
7.6.2 Press the metering button ( preset), the material will be output into the metering cup. Watch the output pressure and the cycling pressure, adjust it if the up/down amount is over 0.5Mpa. Output pressure would be lower than the cycling pressure.
7.6.3 Meter the A and B with electric scales to make sure the amount is right. Or you can change the frequency of A/B metering pump to change the amount.
7.6.4 Adjust the A/B mix ratio to the preset amount
7.6.5 How to calculate the ratio
7.6.5.1 Set Q for the output amount of ( A + B )
7.6.5.2 Material formula will gives the ratio of A/B
7.6.5.3 Set QA for the output of A, so, QA=Q x A/(A+B)
7.6.5.4 Set QB for the amount of B, so, QB=Q x A /(A+B)
7.6.5.5 Adjust the metering pump according to the QA, QB amount
7.6.5.6 Make small adjustment to meet your demand
7.6.6 After the ratio is confirmed, calculate the pouring time of the material. Set the metering time on the working positions.
7.6.7 After metering processes of A and B, make sure the ratio and amount are correct.
Assemble the mix cavity and mixing head to start the foaming process.

 

8. Adjust mix head speed according to product weight.
Run the machine without material, calculate the running time of the mix head from one end to another. Metering the weight of the earplugs during the production, if it is overweight, you need to adjust the mix head running speed faster. If it is less in weight, you need to adjust the running speed lower. Record the parameters, after the adjustment is done.

 

9. Notices after production ended.
9.1 After production, you need to dismantle the mix head and clean the adhesives on it by sink it into the agent (DMF). It is much better if you can clean the mix head once before production proceeds.
9.2 You need to clean the whole production line if you stop production more than 4 days.
9.2.1 Discharge the material into right drum.
9.2.2 Pour DOP liquid into A and B tanks.
9.2.3 Run the metering pump for 30 minutes, and clean up the output and cycling rotates.
9.2.4 Discharge the used liquids and clean it again.

 

10. Knowledge for earplug foaming
10.1 Fixed A/B ratio, fixed mix head running speed, fixed mold temperature, fixed foaming time, fixed de-mold time. About the de-mold time and the hardness of the earplugs, it will be different from different material suppliers.
10.2 Release agent need to be waxed type and need to be fully diluted. Blow the remaining liquid out the mold with air gun to prevent damage of earplugs epidermis.
10.3 If earplugs are not well shaped, there would be problem about releasing agent spray effect or there are adhesives on the mold. Clean the mold with cleaning agents once a week, or you can can clean it whenever you need, according to the mold cleaning level.
10.4 Mold cleaning method: Put MC or DMF or other cleaning agents into the mold. Brush the adhesives out with a small brush. Wear protection uniform when you are doing this, preventing the agent hurting.